Feniosky Peña–Mora


Civil and Environmental Engineering Department,
University of Illinois at Urbana-Champaign,
3129c Newmark Civil Engineering Laboratory,
205 North Mathews Avenue, Urbana, IL 61801
Phone:(217) 244-0187 Fax:(217) 265-8039
feniosky@illinois.edu
Professional Info  Awards  Teaching 
top
 
 
44
1.
*w Peña-Mora F., Aziz Z., Son. J. (2008), "Supporting Collaborative Decision Making In Disaster Response And Recovery Through Improved Situation Awareness," Special Issue of Structural Survey on the role of the built environment professional in disaster management. (Paper Accepted- In Press)
2.
*w Peña-Mora F., Aziz Z., Chen A., Lantz T., Plans A., Foltz S., Mathur S. and Mehta S., (2008) "Supporting Urban Emergency Response & Recovery Using RFID Based Building Assessment," Proceedings of the Institution of Civil Engineers, Special Issue on Urban Design and Planning, ISSN, 1755-0793. (Paper Accepted- In Press)
3.
*w Peña-Mora, F., Han, S., Lee, S., and Park, M., "Strategic-Operational Construction Management: A Hybrid System Dynamics and Discrete Event Approach," ASCE, Journal of Construction Engineering and Management, Reston, VA, Vol. 134, No. 9, September 2008, pp. 701-710.
4.
**w Golparvar Fard, M., Peña-Mora, F., Arboleda, C. and Lee, S.H. (2008), "Visualization of Construction Progress Monitoring using 4D simulation model overlaid on Time-lapsed photographs," accepted for publication in ASCE Journal of Computing in Civil Engineering, Special Edition on Graphical 3D Visualization in Achitecture, Engineering and Construction, Reston, VA.
5.
w Menassa, C., Peña Mora, F., and Pearson, N. (2008), “An Option Pricing Model to Evaluate ADR Investments in AEC Projects,” accepted for publication in Journal of Construction Engineering and Management, ASCE, Reston, VA.
6.
w Tsai, M., Liu, L., Pena-Mora, F., Arboleda, C. (2007), "A Preliminary Design of Disaster-Survivable Building Blackbox System for Urban Disaster Response," accepted for publication in Sensors in Construction and Infrastructure Management, Special Issue of the Journal of Information Technology in Construction.
7.
w Kostoulas, D., Aldunate, R., Pena-Mora, F., Lakhera, S. (2007), "A Nature Inspired Decentralized Trust Model to Enhance Information Reliability in Large Scale Disaster Response Operations," accepted for publication in Elsevier, Journal of Advanced Engineering Informatics, Amsterdam, Netherlands.
8.
Motawa, I., Anumba, C., Lee, S., Peña-Mora, F., “An Integrated System for Change Management System in Construction,” Automation in Construction, Elsevier, Oxford, UK, Vol. 16, No. 3, May 2007, pp. 368-377.
9.
w Lee, S., and Peña-Mora, F., “Understanding and Managing Iterative Error and Change Cycles in Construction,” System Dynamics Review, System Dynamics Society, Albany, NY, Vol. 23, No. 1, April 2007, pp. 35-60.
10.
Ng, H., F. Peña-Mora and Tamaki, T., “Dynamic Conflict Management in Large-Scale Design and Construction Projects,” ASCE, Journal of Management in Engineering, Reston, VA, Vol. 23, No. 2, April 2007, pp. 52-66.
11.
*w Lee, S., F. Peña-Mora and M. Park, “Web-enabled System Dynamics Model for Error and Change Management on Concurrent Design and Construction Projects,” ASCE, Journal of Computing in Civil Engineering, Reston, VA, Vol. 20, No. 4, July-August 2006, pp. 290-300.
12.
*w Lee, S., Peña-Mora, F., Park, M., " Reliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projects," ASCE, Journal of Construction Engineering and Management, Reston, VA, Vol. 132, No. 5, May 2006, pp. 452-464.
13.
*w Aldunate, R., Peña-Mora, F. Nussbaum, M., and Ochoa, S., “Robust Mobile Ad Hoc Space for Collaboration to Support Disaster Relief Efforts Involving Critical Physical Infrastructure,” ASCE, Journal of Computing in Civil Engineering, Reston, VA, Vol. 20, No. 1, January/February 2006 pp. 13-27.
14.
*w Lee, S., Peña-Mora, F, and Park, M., “Dynamic Planning and Control Methodology For Strategic and Operational Construction Project Management,” Automation in Construction, Elsevier, Oxford, UK, Vol. 15, No. 1, January 2006, pp. 84-97.
15.
*w Aldunate, R., F. Peña-Mora and G. Robinson, “Collaborative Distributed Decision Making for Large Scale Disaster Relief Operations: Drawing Analogies from Robust Natural Systems,” Complexity, Wiley, Hoboken, NJ, Vol. 11, No. 2, December 2005, pp. 28-38.
16.
*w Lee, S., Peña-Mora, F, and Park, M., “Quality and Change Management Model For Large Scale Concurrent Design and Construction Projects,” ASCE, Journal of Construction Engineering and Management, Reston, VA, Vol. 131, No. 8, 2005, pp. 890-902.
17.
*w Park, M., and Peña-Mora, F., “Reliability Buffering for Construction Projects,” ASCE, Journal of Construction Engineering and Management, Reston, VA, Vol. 130, No. 5, October 2004, pp 626-637. **
18.
*w Peña-Mora, F., and Mathias, C., “AVSAR: A Collaboration System for Disaster Search and Rescue Operations Using Autonomous Vehicles,” International Journal of IT in Architecture, Engineering and Construction, Vol. 2, No. 2, May 2004, pp. 91-114.
19.
*w Park, M., and Peña-Mora, F., “Development of Dynamic Planning and Control Methodology (DPM): based on the User-defined Dynamic Modeling Approach,” International Journal of IT in Architecture, Engineering and Construction, Vol. 1, No. 4, December 2003, pp. 275-292.
20.
*w Park, M., and Peña-Mora, F., “Dynamic Change Management for Construction,” System Dynamics Review, System Dynamics Society, Albany, NY, Vol. 19, No. 3, Fall 2003, pp. 213-242.
21.
*w Soibelman, L., and Peña-Mora, F., "The Multi-Reason Artificial Mind (M-RAM) Project - A Model and a System Prototype to Support the Conceptual Phase of Structural Design for Tall Buildings Through Distributed Multi-Reasoning Algorithms," International Journal of Computer Integrated Design and Construction (CIDAC), SETO, UK, Introduction Issue, January 2003, pp. 27-42.
22.
*w Peña-Mora, F., Tanaka, S., "Information Technology Planning Framework for Japanese General Contractors," ASCE, Journal of Management in Engineering, Reston, VA, Vol.18, No. 3, July 2002, pp. 138-149.
23.
*w Peña-Mora, F., Dwivedi, G. "A Multiple Device Collaborative and Real Time Analysis System for Project Management in Civil Engineering," ASCE, Journal of Computing in Civil Engineering, Reston, VA, Vol. 16, No. 1, January 2002, pp. 23-38.
24.
*w Peña-Mora, F., and Park, M., “Dynamic Planning for Fast-Tracking Building Construction Projects,” ASCE, Journal of Construction Engineering and Management, Reston, VA, Vol. 127, No. 6, November/December 2001, pp. 445-456.
25.
*w Peña-Mora, F. and Choudary, K., “Web-Centric Framework for Secure and Legally Binding Electronic Transactions in Large Scale A/E/C Projects,” ASCE, Journal of Computing in Civil Engineering, Reston, VA, Vol. 15, No. 4, October 2001, pp. 248-258.
26.
*w Peña-Mora, Feniosky and Mills, J., “Component-based Architecture for Online Collaborative Disaster Relief Mission Planning Environments,” International Journal of Computer Integrated Design and Construction (CIDAC), SETO, UK, Vol. 3, No. 2, May 2001, pp. 70-87.
27.
*w Pena-Mora, F., Vadhavkar, S., and Dirisala, S., "Component-Based Software Development for Integrated Construction Management Software Applications," Artificial Intelligence for Engineering Design, Analysis and Manufacturing (AI EDAM) Journal, Vol. 15, No. 2, April 2001, pp. 173-187.
28.
*w Peña-Mora, F., and Tamaki, T., “Effect of Delivery Systems on a Collaborative Negotiations for Large-Scale Infrastructure Projects,” ASCE, Journal of Management in Engineering, Reston, VA, Vol. 17, No. 2, March/April 2001, pp. 105-121.
29.
*Favela, J. and Peña-Mora, F., “An Experience in Collaborative Software Engineering Education,” IEEE Software, Vol. 18, No. 2, March/April 2001, pp. 47-53.
30.
*w Peña-Mora, F., and Li, M., “Dynamic-Planning and Control Methodology for Design/Build Fast-Track Construction Projects,” ASCE, Journal of Construction Engineering and Management, Reston, VA, Vol. 127, No. 1, January/February 2001, pp. 1-17.
31.
*w Peña-Mora, F., and Harpoth, N., “Effective Partnering in an Innovative Procured Multicultural Project,” ASCE, Journal of Management in Engineering, Reston, VA, Vol. 17, No. 1, January/February 2001, pp. 2-13.
32.
*w Peña-Mora, F., Hussein, K., Vadhavkar, S., and Benjamin, K., “CAIRO: A Concurrent Engineering Meeting Environment for Virtual Design Teams,” Artificial Intelligence in Engineering Journal, Special issue on Concurrent Engineering, Vol. 14, No. 3, July 2000, pp. 203-219.
33.
*w Soibelman, L., and Peña-Mora, F., "A Distributed Multi-Reasoning Mechanism to Support Conceptual Structural Design," ASCE, Journal of Structural Engineering, Reston, VA, Vol. 126, No. 6, June 2000, pp. 733-742.
34.
*w Peña-Mora, F., Anumba, C., and Solari, J., “An Integrated Telepresence Environment for Collaboration in Construction,”  Engineering with Computers: International Journal for Simulation-Based Engineering, Special Issue honoring Prof. Steve Fenves on Computer Aided Engineering, Vol. 16, No. 3-4, April 2000, pp. 287-305.
35.
*w Peña-Mora, F., Vadhavkar, S., Perkins, E., and Weber, T., "Information Technology Planning Framework for Large-Scale Civil Infrastructure Projects," ASCE, Journal of Computing in Civil Engineering, Reston, VA, Vol. 13, No. 4, October 1999, pp. 226-237.
36.
*w Hussein, K. and Peña-Mora, F., "Frameworks for Interaction Support in Distributed Learning Environments," ASCE, Journal of Computing in Civil Engineering, Reston, VA, Vol. 13, No. 4, October 1999, pp. 291-302.
37.
*w Peña-Mora, F. and Hussein, K., "Interaction Dynamics in Collaborative Civil Engineering Design Discourse: Applications in Computer Mediated Communication,'' Journal of Computer-Aided Civil and Infrastructure Engineering, Vol. 14, May 1999, pp. 171-185.
38.
*w Peña-Mora, F. and Hussein, K., "Proactive Meeting Management for Distributed Collaborative Design,'' International Journal of Advances in Engineering Software, Vol. 29, No. 10, December 1998, pp. 839-849.
39.
*w Peña-Mora, F.and Wang, C.," Computer-Supported Collaborative Negotiation Methodology," ASCE, Journal of Computing in Civil Engineering, Reston, VA, Vol. 12, No. 2, April 1998, pp. 64-81.
40.
*w Peña-Mora, F. and Vadhavkar, S., "Augmenting Design Patterns with Design Rationale," Artificial Intelligence for Engineering Design, Analysis and Manufacturing (AIEDAM), Special Issue on Design Rationale, Vol. 11, April 1997, pp.93-108.
41.
*w PeñaMora, F., Hussein, K. and Sriram, D., "CAIRO: A System for Facilitating Communication in a Distributed Collaborative Engineering Environment,” Computers in Industry, Vol. 29, No. 1-2, July 1996, pp. 37-50.
42.
*s PeñaMora, F., Sriram, D. and Logcher, R., "Conflict Mitigation System for Collaborative Engineering,” Artificial Intelligence for Engineering Design, Analysis and Manufacturing (AIEDM), Special Issue on Concurrent Engineering, Vol. 9, No. 2, May 1995, pp. 101-124.
43.
*s Peña -Mora, F., Sriram, D. and Logcher, R., "Design Rationale for Computer Supported Conflict Mitigation,'' ASCE, Journal of Computing in Civil Engineering, Reston, VA, Vol. 9, No. 1, January 1995, pp. 57-72. Received the 1995 Best Paper Award from the ASCE Technical Council on Computer Practices.
44.
*s Peña, F. and Logcher, R., "Capturing Design Assumptions for Rational Coordination, Integration and Negotiation in the Design Process,'' Computing Systems in Engineering, Vol. 3, No. 6, 1992, pp. 651-660.
 
* Undergone stringent editorial review by peers
** Invited and carries with it prestige and recognition
s Based on my work as a student
w Co-authored with students I supervise
 

© copyright 2008 Feniosky Peña-Mora